2017-04-25
According to the user URS prepared FS file, the use of industrial control server as the master, through the switch with Ethernet or ProfiBus DP communication, the independent control system will be integrated into the overall network system, the use of 3-level password authorization management system, so that all devices are in normal Orderly network operation, and can achieve off-site online monitoring.

Shanghai Fenein Fluid Equipment Engineering Technology Co., Ltd All rights reserved Shanghai ICP prepared 14021247 number Disclaimer